Steve Watson Building
End User
Airbus
Client
CBRE
Project Overview
Hatham R Construction, working on behalf of CBRE, were appointed to deliver the refurbishment and extension of the Steve Watson Building, a single-storey office building within the Airbus campus. The works provided modern office accommodation and welfare facilities for Airbus senior staff, located close to the runway to support monitoring of airside activities.
Client Goals
Refurbish and extend the existing office building.
Provide new, modern office and welfare facilities for senior staff.
Upgrade building services to meet energy, safety, and
compliance requirements.
Deliver a state-of-the-art, futureproofed workplace close to airside operations.
Our Approach
Extension works to create additional office and welfare space.
Full MEP upgrade, including:
New ventilation and above-ground drainage.
Energy-efficient electrical installations.
New boiler system.
Integrated access control and CCTV.
Roof replacement – flat felt roof and cold loft space removed and replaced with a pitched bitumen/tile roof, creating warm attic storage.
Internal upgrades – installation of acoustic-rated suspended ceilings for comfort and noise control.
Fire safety compliance – new fire strategy incorporated to meet current regulations.
Delivered Value
On Time, On Budget – successfully delivered within the £1.2M
Energy & Cost Savings – new MEP services and energy-efficient
systems projected to reduce running costs by up to 20% annually.
Improved Security & Operations – new access control and CCTV systems streamline building management and security.
Enhanced Staff Wellbeing – improved ventilation, acoustic ceilings, and new welfare facilities create a better working
environment.
Futureproofed Design – pitched roof and attic storage increase resilience and adaptability for future needs.
Outcome
The refurbished Steve Watson Building now provides Airbus senior staff with a modern, efficient, and strategically located workplace, combining operational functionality with improved energy efficiency and staff comfort.